Hanwell, London - 2017
- Installation of 5 metal I-beams.
- Slope roof.
- Digging rainwater soakaway 2,5 m³.
- Eco drain system (rain water drain).
- Tiling of all ground floor.
- Central heating UFH for all kitchen and dining room.
- Full interior decoration.
- Patio building.